    A
    FEW EXAMPLES OF ACCOMPLISHMENTS 
    IDROMEC SYSTEM
     
     
     REFINERY WATER
    LINE 
    Client: ENI - ANIC Gela (Italy) 
    Scope of the service: removal of thick encrustations 
    Pipe size: 42 km- o.dia. 24" and 26" (steel pipe) 
    Flow rate before cleaning: 1300 m3/h 
    Flow rate after cleaning: 1960 m3/h 
    Time to clean: 18 hours 
    Increase of flow rate after cleaning: about 50% 
      
    CRUDE LOADING LINE 
      Client: ENI - ANIC
    Gela (Italy) 
    Scope of the service:  removal of encrustations and foreign
    objects 
    Pipe size: 6 km- 8 lines - o.dia. 10"-16" and 24"
    (steel pipe) 
    Time to clean: 1 hour each line 
      
    COOLING WATER INTAKE FOR THERMAL POWER
    STATION 
    Client: Govt. Water Board - TUSLA (ex Yugoslavia) 
    Scope of the service: removal of encrustations 
    Pipe size: 8.5 km- o.dia. 28" (asbestos) 
    Flow rate before cleaning: 490 l/s 
    Flow rate after cleaning: 720 l/s 
    Increase of flow rate after cleaning: about 45% 
     
     
    OIL FIELD GATHERING SYSTEM 
    Client: Ö. M. W (AUSTRIA) 
    Scope of the service: removal of very hard encrustations 
    Pipe size: 50 km- o.dia. 6"-7"-8" and 12" (asbestos) 
     
     
    SEA WATER INTAKE FOR COKE PLANT 
    Client: Nuova Fornicoke - Savona (Italy) 
    Scope of the service: removal of encrustations and marine fouling 
    Pipe size: l.1 km - o.dia. 18" (steel pipe) 
      
    MUNICIPAL WATERWORKS 
    Client: Municipality of Zagreb (ex Yugoslavia) 
    Scope of the service: removal of tuberculation and encrustations 
    Pipe size: 130 km- o.dia. 6"-7"-8"-12" and 14"
    (cast iron) 
      
    MUNICIPAL WATERWORKS 
    Client: Municipality of Sezana (ex Yugoslavia) 
    Scope of the service: removal of deposits and encrustations 
    Pipe size: 23 km- o.dia. 8" (asbestos) 
    Increase of flow rate after cleaning: about 25% 
      
    WATER GATHERING  
    Client: Italian Railways Rome (Italy) 
    Scope of the service: removal of deposits and encrustations 
    Pipe size: 88 km- o.dia. 4"-6"-8" and 12" (cast
    iron and asbestos) 
    Increase of flow rate after cleaning: about 50% 
      
    STEEL MILL OUTFALL 
    Client: Italsider -Taranto (Italy) 
    Scope of the service: removal of heavy deposits and slurry 
    Pipe size: 8.4 km - o.dia. 14"-28"-40 and 48" (steel
    pipe) 
    Note: lines were plugged at 90% of the free flow area 
      
    MUNICIPAL WATERWORKS 
    Client: Municipality of Pecs (Hungary) 
    Scope of the service: removal of tuberculations and encrustations 
    Pipe size: 87 km - o.dia. 700 mm (steel and cast iron) 
    Flow rate before cleaning: 35000 m3/day 
    Flow rate after cleaning: 44000 m3/day 
    Increase of flow rate after cleaning: about 25% 
      
    MUNICIPAL WATERWORKS 
    Client: Regional Govt. of Kavminvody (Russia) 
    Scope of the service: removal of slurry and encrustations 
    Pipe size: 18.6 km - o.dia. 40" (steel pipe) 
    Flow rate before cleaning: 463 Lt/sec 
    Flow rate after cleaning: 945 Lt/sec 
    Increase of flow rate after cleaning: about 100% 
    Note: removed about 2000 tons of slurry and sca1es 
      
     
     MUNICIPAL WATERWORKS 
    Client: Municipality of Nuremberg (West Germany) 
    Scope of the service: cleaning and removal of encrustations 
    Pipe size: 13.5 km - o.dia. 26" (steel pipe) 
    Increase of flow rate after cleaning: about 30% 
      
    CRUDE OIL LINE CONVERTED INTO A WATER
    LINE 
    Client: Khalda Oil Company (Egypt) 
    Scope of the service: removal of encrustations and healthful
    interventions  
    Pipe size: 26 km - o.dia. 8" (steel pipe) 
     
      
     WATER INJECTION
    SYSTEM FOR SECONDARY OIL RECOVERY 
    Client: Gulf of Suez Petroleum Co.(Gupco) offshore
    Red Sea (Egypt) 
    Scope of the service: removal of encrustations and suspended
    solids(restoring water design purity - offshore platforms) 
    Pipe size: 154 km - o.dia. 8"-12"-18" and 24"
    (steel pipe) 
      
    WATER INJECTION SYSTEM FOR SECONDARY
    OIL RECOVERY 
    Client: Petrobel offshore Red Sea (Egypt) 
    Scope of the service: removal of encrustations and cleaning
    ,restoring original flow rate (offshore platforms) 
    Pipe size: 60 km - o.dia. 8"and 26" (steel pipe) 
    Increase of flow rate after cleaning: min.20% - max.27% 
      |